Single Malt progress (9)

This weekend is a holiday weekend for me. Normally that might mean lots of extra knitting time. Right now it means extra trips back and forth between houses, with some excursions to Home Depot thrown in. At least I have been able to work on this sweater a bit in the evenings, so I have hope it will still be ready in time for xmas. I’ve made a few inches of progress since my last update. I’m currently on my 7th (50g) ball of yarn, and about 3/4 of the way through the body.

Advertisement

Comments are closed.

Website Powered by WordPress.com.

Up ↑

%d bloggers like this: